Navigating the Maze of Korea's Power Grid Code: Lost in Translation

신재생/해상풍력

by ElecMania 2023. 12. 18. 23:01

본문

As multinational energy development companies set their sights on the promising landscape of South Korea, they find themselves grappling with a unique challenge – understanding the intricacies of the country's power grid code. In a realm where terms like "연계점" (Interconnection Point) and "접속점" (Connection Point) diverge significantly from their global counterparts such as POC (Point of Connection), PCC (Point of Common Coupling), and POI (Point of Interconnection), these companies are finding interpretation a daunting task.

In the dynamic world of global energy, clarity and standardization in grid codes are vital. The disparities in terminologies between Korea's grid code and international standards are proving to be stumbling blocks for companies seeking seamless integration into the Korean energy landscape.

One of the critical pain points revolves around the unclear specifications for reactive power demand conditions. The ambiguity surrounding the requirements for reactive power supply in relation to voltage, coupled with the lack of specificity in harmonic distortion conditions, poses a substantial risk to project viability.

The power sector operates on a global scale, and harmonizing practices and standards is essential for fostering innovation and collaboration. The challenges faced by companies in deciphering Korea's grid code highlight the need for a more comprehensive, standardized approach to terminologies and regulations in the energy industry.